Caltex Oil Co. Projects

Removal of floating roof, 36 metres in diameter with shears.

Fremantle WA, 2014
Remove 350 metres of redundant 12 inch / 300 mm bunker line from under the Fremantle Wharf at Victoria Quay from Shed C to Shed D.

Click the image to view large

Darwin, NT 2005
Demolition of Dinah Beach Road Terminal, Darwin.

Click the image to view large

Subscribe to RSS - Caltex Oil Co. Projects

Our latest project:

Our Services

  • Demolition and Commissioning of fuel installations
  • Relocation of vertical and horizontal tanks
  • Pipe work (pressure, stainless steel, copper)
  • All types of gas free and hot work
  • All structural steel
  • Concrete and earth works
  • Asbestos removal
  • Painting and electrical