Demolition of Shute Harbour Motel
Airlie Beach QLD
July 2022
Private Sector- Ironbark Pty LTD
Demolish single storey cyclone damaged motel
- Removal of all materials/rubble from site
- Slab to remain undamaged

Demolition of Ergon Office Block
Proserpine
June 2022
Private Sector- McMahons
Demolish double brick office block in front of warehouse
- Removal of suspended slab within warehouse
- Warehouse to remain undamaged, as directed by client
- Concrete floor and slabs remain undamaged

Demolition of Colonial Motel
Airlie Beach QLD
August 2021
Private Sector- Red Emperor Constructions
Demolish double story besser block motel with excavator
- Removal of slab and footings
- Leave site clean and level
Demolition of the Proserpine Entertainment Centre
February 2020
Local Government – Whitsunday Regional Council
Demolish the Proserpine Entertainment Centre building located at 14 Main St Proserpine, to enable the construction of the new Entertainment Centre
- Complete removal of building – internal soft demolition, roof removal, dismantling of purlins
- Removal of building slabs, footpaths, driveways, crossovers and all other infrastructure and reticulated services
- Clear all debris trees, root balls, grasses
Demolition of Sound Shell at Music Bowl Parkhurst Rockhampton
November 2019
Local Government – Rockhampton Regional Council
Demolish and removal of full roof structure down to stage level floor height.
- Ensuring the stage remained undamaged and structurally sound
- Removal of all remaining handrails around stage level
- Install compliant handrails around full exterior of stage
Demolition of the Interpretive Centre on Flagstaff Hill Bowen
October 2019
Local Government – Whitsunday Regional Council
Demolish building including slabs, removal of all:
- Footings
- Walkways
- Outdoor gazebo
- Debris from site leaving area level, clean and tidy
Demolition of Desalination units and removal from Hayman Island
February 2019
Private sector – MAL Hayman Limited
Demolish and remove from Hayman Island 3 60 tonne redundant desal units. Project involved:
- Lowering desal vessels using jacking system
- Cutting up by oxy
- Removal of 1500 condenser tubes
- Island logistics for freight
Demolition of Airlie Beach and Proserpine Shops
April 2018
Private Sector
Project involved demolition of shop building and unit block:
- Double storey building
- Asbestos removal
Demolition of 13 buildings within Great Keppel Island Resort
May 2018
Private Sector – Great Keppel Island Resort PTY LTD
Demolition works at the existing resort area to prepare for redevelopment of the site. Scope of works was to:
- Remove 13 building/structures
- Minor reshaping of the landscape to reflect the natural surrounding environment
Demolition of shed and tank at Proserpine Treatment Plant
May 2017
Private Sector – Downer Utilities Australia PTY LTD
The vessels demolished were:
- Old Inlet Works
- Primary Digester
- Old Primary Digester pump shed
- Brick laboratory and associated old green chlorination shed
Demolition of Navy Fuel Lines in Waterfront Precinct Darwin
June 2016
Private Sector – Darwin Waterfront Corporation
Removal of 3 kilometres of redundant fuel pipe that was once navy lines and old bunker lines:
- Excavatation
- Purging
- Degasing
- Back fill pipeline trenches
Construct import diesel line at Woodside King Bay facility near Dampier
August 2011
Shell Company of Australia and Woodside
Phase 1 of the project was for the installation of a new 300 mm Diesel Import line. Total length of the line is approximately 900 metres. Work was mechanical, culverts and civil foundations.
The main activities carried out during the project were:
- Steel Fabrication
- Installation of pipeline
- Welding of pipeline
- Erection of temporary fencing & construction barriers from DPA
- Traffic control barriers
- Excavation and installation of pipe supports and footings
- Excavation and installation of culverts
- Concreting
- Painting and blasting
- Scaffolding
Demolition of Shell Terminals at Darwin, Tennant Creek, Albany, Esperance, Kalgoolie, Merriden, Katherine and Moree
2005 to 2009
Shell Company Australia
Demolition of above ground and underground fuel stage tanks and associated pipework.
- Tanks ranged in size – from 10,000 litre tanks to 15 million litre tanks
- Truck filled gantries
- Ship import lines